Live 24-Layer Agency Snapshot: T17S R30E Sec 21 (32.8180, -103.9750)
Identified Regulatory Factors
- Split-Estate conflict: Private surface over All Federal Minerals subsurface.
- 11 open NMOCD C-141 spill incident(s) within 1.0 mile.
- NMED environmental contamination records nearby: 1 LUST tank release(s), 0 state cleanup site(s), 0 brownfield(s).
- 3 NMOCD brine solution-mining well(s) within 3.0 miles.
- 14 USFWS National Wetlands Inventory feature(s) within 1.0 mile.
19.15.29.12 NMAC Table I Closure Limits (51 - 100 ft)
| Depth Tier | Chloride | TPH | BTEX / Benzene |
|---|---|---|---|
| Moderate (Depth 51 - 100 ft) | 10,000 mg/kg | 2,500 mg/kg | 50 mg/kg / 10 mg/kg |
Need an Exact 24-Layer Parcel Audit in Loco Hills / US-82 Corridor (Eddy County)?
Drop a pin on your exact boundary on our Satellite Map Studio to pull all record tables, direct NMOCD C-141 imaging files, FEMA flood/wetland determinations, EPA/NMED sites, and a printable Audit-Ready PDF Dossier ($195) or C-141 Site Pack ($95).
Frequently Asked Questions
What is the BLM Karst Potential in Loco Hills / US-82 Corridor (Eddy County) (T17S R30E Sec 21)?
At reference coordinate (32.8180, -103.9750) in T17S R30E Sec 21, the BLM Carlsbad Field Office Karst Potential is classified as Low. Because karst boundaries can cross section lines, run an exact parcel pin check before closing.
Is T17S R30E Sec 21 inside the Secretary’s Potash Area?
No. The reference point in T17S R30E Sec 21 falls outside the NMSLO Designated Potash District boundary, though exact parcel corners should always be verified on the live map.